Show on map
Hydra — Power plant · Storage · ENGIE North AmericaRE Maplewood — Solar · TX · 300 MW · 3.5 km awayMorada del Sol, LLC — Solar · TX · 247 MW · 17.2 km awayGreenalia Solar Power Blackwelder Ranch — Solar · TX · 199.7 MW · 22.3 km awayBlackwelder Ranch Wind — Wind · TX · 110.4 MW · 22.3 km awayMendoza Trail BESS — Storage · TX · 200 MW · 22.5 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-21,954 MWh
Grid
345 kV to Electric Transmission Texas LLC (ERCO)
Location
Pecos County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Electric Transmission Texas LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-21,954
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -21954.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
RE Maplewood Postponed Solar 3.5 km 300
Morada del Sol, LLC Postponed Solar 17.2 km 247
Greenalia Solar Power Blackwelder Ranch Announced Solar 22.3 km 199.7
Blackwelder Ranch Wind Announced Wind 22.3 km 110.4
Mendoza Trail BESS Under construction Storage 22.5 km 200

Sources EIA-860M

Sources

Attribution