Show on map
IMEA Flora — Power plant · Oil · Illinois Municipal Elec Agency (IL)CF IL Solar Marigold Lane, Flora2 LLC — Under construction · Solar · IL · 2 MW · 2.6 mi awayFlora Solar — Announced · Solar · IL · 125 MW · 3.0 mi awaySV CSG Diel 1 — Under construction · Solar · IL · 5 MW · 13.3 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2025
71 MWh
Grid
4 kV to City of Flora - (IL) (MISO)
Location
Clay County, Illinois
Operated by
Illinois Municipal Elec Agency (IL)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025
Fuel burned MMBtu by year, 2003 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
26 years since 2000
Unused energy
79 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,197 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
4.20
Transmission owner
City of Flora - (IL)
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 2025795
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202511,197.2
Net generation (MWh), 202571
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CF IL Solar Marigold Lane, Flora2 LLC Under construction Solar 2.6 mi 2
Flora Solar Announced Solar 3.0 mi 125
SV CSG Diel 1 Under construction Solar 13.3 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution