Show on map
Indeck Energy-Alexandria — Power plant · Biomass · Indeck Energy-Alexandria, LLC
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Indeck Energy-Alexandria

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2008
Net generation, 2021
0 MWh
Location
Grafton County, New Hampshire

Output

Net generation MWh by year, 2013 to 2021
Fuel burned MMBtu by year, 2013 to 2021
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
18 years since 2008
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110041999923
NAICS code
221119
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007126
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2021
Capacity retired
16 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Wood/Wood Waste Biomass16 MWRetiredJuly 2021

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ISNE
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Indeck Energy-Alexandria, LLC Operator EIA-860M
INDECK ENERGY Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit GEN1 scheduled to retire, 16 MW · EIA-860M
  • In service · EIA-860M