Show on map
INEOS Naperville Cogeneration Plant — Power plant · Gas, combustion turbine · INEOS US Chemicals Company - Naperville CampusMERIDIAN PARKWAY DATA CENTER OWNER LLC — Built · Large load · IL · 4.4 mi awayEDGED CHICAGO LLC — Built · Large load · IL · 4.8 mi awayCYRUSONE LLC — Large load · IL · 5.1 mi awayCYRUSONE LLC — Large load · IL · 5.2 mi awayAurora 7-SLCHI307 — Under construction · Solar · IL · 1.9 MW · 6.2 mi awayCOLOVORE LLC — Built · Large load · IL · 6.3 mi awayORD-02 (West Chicago data centre) — Filed · Large load · IL · 6.4 mi awayENSONO DATA CENTER — Built · Large load · IL · 6.5 mi awayCLOP CAROL STREAM IL LLC — Built · Large load · IL · 7.1 mi away1454.07-IL 7 (Gevena data centre) — Filed · Large load · IL · 7.5 mi away360 TCS LLC — Built · Large load · IL · 7.7 mi awayGlendale Heights 10-SLCHI910 — Under construction · Solar · IL · 1.3 MW · 9.1 mi awayAddison 11-SLCHI404 — Under construction · Solar · IL · 1.6 MW · 9.7 mi awayInternationale Ctr 11-SLCHI321 — Under construction · Solar · IL · 1.8 MW · 9.9 mi awayCLEARBLUE TECHNOLOGIES/OAKBROOK INC — Built · Large load · IL · 10.9 mi awayAligned (Northlake data centre) — Built · Large load · IL · 13.8 mi awayNTT Data Centers — Built · Large load · IL · 14.2 mi awayNorthlake 2-SLCHI302 — Under construction · Solar · IL · 1.6 MW · 14.2 mi awayNorthlake 4-SLCHI304 — Under construction · Solar · IL · 1.4 MW · 14.2 mi awayMICROSOFT CORP-CHICAGO DATA CENTER — Built · Large load · IL · 14.3 mi awayNALCO WATER — Built · Large load · IL · 14.3 mi awayNorthlake 3-SLCHI303 — Under construction · Solar · IL · 1.6 MW · 14.4 mi awayNorthlake 5-SLCHI305 — Under construction · Solar · IL · 2.5 MW · 14.4 mi awayT5@CHICAGO III LP — Built · Large load · IL · 14.7 mi awayT5 Data Center Northlake — Filed · Large load · IL · 14.7 mi awayCopenhagen Ct — Under construction · Solar · IL · 3.5 MW · 14.8 mi awayCHICAGO ENTERPRISE LLC — Built · Large load · IL · 14.9 mi awayRomeoville 34 - SLCHI234 - BSCHI234 — Under construction · Storage · IL · 0.5 MW · 14.9 mi awayCyrus One V3 Point 1 — Under construction · Large load · IL · 14.9 mi awayBensenville 2-SLCHI526 — Under construction · Solar · IL · 1.9 MW · 14.9 mi awayAC IL - Lockport East — Under construction · Solar · IL · 3.1 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

INEOS Naperville Cogeneration Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 38% of 2023 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2023
27,646 MWh
Location
DuPage County, Illinois

Output

Net generation MWh by year, 2001 to 2023
Fuel burned MMBtu by year, 2001 to 2023
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
36 years since 1990
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110017300678
Subparts reported
C
NAICS code
541380
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006259
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2023
Capacity retired
8.3 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine8.3 MWRetiredDecember 2023

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
INEOS USA LLC Owner 100.0% Dec 31, 2023 EPA GHGRP
INEOS US Chemicals Company - Naperville Campus Operator EIA-860M

Timeline

  • Stated Unit GEN1 scheduled to retire, 8.3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MERIDIAN PARKWAY DATA CENTER OWNER LLC Built Large load 4.4 mi
EDGED CHICAGO LLC Built Large load 4.8 mi
CYRUSONE LLC × 2 units Unknown Large load 5.1 mi
Aurora 7-SLCHI307 Under construction Solar 6.2 mi 1.9
COLOVORE LLC Built Large load 6.3 mi
ORD-02 (West Chicago data centre) Filed Large load 6.4 mi
ENSONO DATA CENTER Built Large load 6.5 mi
CLOP CAROL STREAM IL LLC Built Large load 7.1 mi
1454.07-IL 7 (Gevena data centre) Filed Large load 7.5 mi
360 TCS LLC Built Large load 7.7 mi
Glendale Heights 10-SLCHI910 Under construction Solar 9.1 mi 1.3
Addison 11-SLCHI404 Under construction Solar 9.7 mi 1.6
Internationale Ctr 11-SLCHI321 Under construction Solar 9.9 mi 1.8
CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built Large load 10.9 mi
Aligned (Northlake data centre) Built Large load 13.8 mi
NTT Data Centers Built Large load 14.2 mi
Northlake 2-SLCHI302 Under construction Solar 14.2 mi 1.6
Northlake 4-SLCHI304 Under construction Solar 14.2 mi 1.4
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 14.3 mi
NALCO WATER Built Large load 14.3 mi
Northlake 3-SLCHI303 Under construction Solar 14.4 mi 1.6
Northlake 5-SLCHI305 Under construction Solar 14.4 mi 2.5
T5@CHICAGO III LP Built Large load 14.7 mi
T5 Data Center Northlake Filed Large load 14.7 mi
Copenhagen Ct Under construction Solar 14.8 mi 3.5
CHICAGO ENTERPRISE LLC Built Large load 14.9 mi
Romeoville 34 - SLCHI234 - BSCHI234 Under construction Storage 14.9 mi 0.5
Cyrus One V3 Point 1 Under construction Large load 14.9 mi
Bensenville 2-SLCHI526 Under construction Solar 14.9 mi 1.9
AC IL - Lockport East Under construction Solar 15.0 mi 3.1

Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution