Show on map
- Combustion
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Under construction
- Operating
- Size not stated
Inforum: location and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Inforum
Power plant · Oil
Key facts
Power plant · Oil Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1989
- Net generation, 2025
- 0 MWh
- Grid
- 4 kV to Georgia Power Co (SOCO)
- Location
- Fulton County, Georgia
- Operated by
- DCII-250 Williams Street NW, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 37 years since 1989
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | SOCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DATA CENTER ATLANTA, LLC Built | Large load | 1.5 mi | |
| QUALITY INVESTMENT PROPERTIES METRO, LLC Built | Large load | 2.4 mi | |
| Leibherr LR 1400 (Atlanta data centre) Filed | Large load | 5.4 mi | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 8.9 mi | |
| TA Reality Ellenwood Data Center Filed | Large load | 8.9 mi | |
| DeKalb County Green Energy Facility Postponed | Biomass | 10.1 mi | 1.6 |
| ATL06 DATA CENTER Under construction | Large load | 10.5 mi | |
| GOOGLE, INC. Built | Large load | 11.1 mi | |
| ATL11 DATA CENTER Built | Large load | 11.5 mi | |
| Vantage Data Center Crane Under construction | Large load | 11.6 mi | |
| ROCK HOUSE ROAD DATA CENTER Under construction | Large load | 12.1 mi | |
| Vantage Data Centers GA1, LLC Under construction | Large load | 13.2 mi | |
| ALIGNED DATA CENTERS ATL01 Built | Large load | 13.3 mi | |
| EDGECONNEX ATL11, LLC Filed | Large load | 13.4 mi | |
| FTY01 DATA CENTER Under construction | Large load | 13.5 mi |
Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · EPA ICIS-NPDES · Georgia EPD
Sources
- EPA ICIS-Air
- FAA OE/AAA
- EIA-860M
- EPA ICIS-NPDES
- Georgia EPDSource: Georgia Environmental Protection Division, Air Protection Branch