Inland Empire Energy Center — Power plant · Gas, combined cycle · Inland Empire Energy Ctr LLCTrestles Grid LLC — Postponed · Storage · CA · 150 MW · 0.6 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 7.0 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 7.1 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 8.5 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 10.0 mi awayWildomar Solar — Postponed · Solar · CA · 1.2 MW · 10.4 mi awayChiquito Grid, LLC — Postponed · Storage · CA · 80 MW · 11.6 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Inland Empire Energy Center

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 0% of 2019 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2019
33,125 MWh
Location
Riverside County, California

Output

Net generation MWh by year, 2009 to 2020
Fuel burned MMBtu by year, 2009 to 2020
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
17 years since 2009
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110030747011
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000469
Balancing authority codeCISO

Wind turbines

Turbines
1
Turbine capacity (MW)
1
Turbine models
1 Mitsubishi MWT62/1.0
Hub height (m)
55
Rotor diameter (m)
61.4
Year online
2011

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2020
Capacity retired
819 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combined Cycle409.5 MWRetiredJanuary 2020
2Natural Gas Fired Combined Cycle409.5 MWRetiredJanuary 2020

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
GENERAL ELECTRIC CO Owner 100.0% Dec 31, 2023 EPA GHGRP
Inland Empire Energy Ctr LLC Operator EIA-860M

Timeline

  • Stated Units 1, 2 scheduled to retire, 819 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · U.S. Wind Turbine Database · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Trestles Grid LLC Postponed Storage 0.6 mi 150
San Jacinto Solar Postponed Solar 7.0 mi 1.5
Lake Perris Solar Postponed Solar 7.1 mi 1.5
Perris DC 5 - sline015 Under construction Solar 8.5 mi 1.6
Amazon - Moreno Valley Postponed Solar 10.0 mi 2.2
Wildomar Solar Postponed Solar 10.4 mi 1.2
Chiquito Grid, LLC Postponed Storage 11.6 mi 80

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution