- Combustion
- Wind & solar
- Loads
- Operating
- Retired
- Size not stated
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- Operating
- Retired
- Size not stated
- Other companies nearby
26 assets · 2 projects
26 assets · 2 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 1 project: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
1 outside this view, drawn where they are: zoom out to see it.
General Electric CO
Power plant owner
As filed: GENERAL ELECTRIC CO
Key facts
Power plant owner · 6,465.3 MW- Capacity held
- 6,465.3MW
- Assets
- 26
- Projects
- 3
- States
- CA, FL, MA, MS, NJ, PA
- Companies below
- 2
- Headquarters
- Evendale, United States Source: Wikidata
- Website
- geaerospace.com Source: Wikidata
- Listed
- NYSE: GE Source: SEC EDGAR
- LEI
- 3C7474T6CDKPR9K6YT90 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why
Gross output of plants with a stake
7 of 14 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 7 of 14 plants with a stake: US plants with an EIA monthly series.100% of the output is from 7 plants recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Not included: 12 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
- Oil
- Solar
Yearly totals
| Year | Gas | Oil | Solar | Total (MWh) |
|---|---|---|---|---|
| 2026 (part year) | 3,569,785 | 880 | 1,410 | 3,572,075 |
| 2025 | 5,728,097 | 4,819 | 2,489 | 5,735,405 |
| 2024 | 5,513,472 | 6,112 | 2,294 | 5,521,878 |
| 2023 | 4,059,297 | 2,809 | 2,323 | 4,064,429 |
| 2022 | 5,412,251 | 3,382 | 2,441 | 5,418,074 |
| 2021 | 4,676,007 | 3,463 | 2,296 | 4,681,766 |
| 2020 | 4,730,328 | 3,286 | 16,359 | 4,749,973 |
| 2019 | 4,252,239 | 6,497 | 53,911 | 4,312,647 |
| 2018 | 4,965,576 | 3,824 | 61,785 | 5,031,185 |
| 2017 | 5,292,606 | 1,731 | 62,284 | 5,356,621 |
| 2016 | 6,222,350 | 3,545 | 57,113 | 6,283,008 |
| 2015 | 4,729,983 | 10,797 | 49,017 | 4,789,797 |
| 2014 | 6,135,853 | 6,019 | 36,483 | 6,178,355 |
| 2013 | 6,014,283 | 6,327 | 45,367 | 6,065,977 |
| 2012 | 9,302,641 | 28 | 70,481 | 9,373,150 |
| 2011 | 8,130,714 | 27 | 55,310 | 8,186,051 |
| 2010 | 9,184,119 | 1,982 | 56,114 | 9,242,215 |
| 2009 | 6,156,676 | 435 | 64,010 | 6,221,121 |
| 2008 | 4,275,043 | 4,003 | 62,396 | 4,341,443 |
| 2007 | 3,562,777 | 6,722 | 96,053 | 3,665,552 |
| 2006 | 1,632,682 | 6,139 | 123,819 | 1,762,639 |
| 2005 | 1,860,046 | 7,160 | 118,791 | 1,985,996 |
| 2004 | 2,227,374 | 0 | 131,059 | 2,358,433 |
| 2003 | 1,609,017 | 8,241 | 120,337 | 1,737,595 |
| 2002 | 1,089,634 | 8,729 | 145,882 | 1,244,245 |
| 2001 | 510,924 | 8,475 | 146,653 | 666,051 |
Sources GEM · EIA-860 · EIA-860M · EIA · EPA GHGRP
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA-860
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA GHGRP
Projects 3
Capacity
0.52 GW
none active
2 load not summed
Including subsidiaries
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Company | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|---|
| Postponed | Shady Hills Generating Station | Gas, combustion turbine | 518 MW | FL | Shady Hills Power Co LLC | — | EIA-860M |
| Built | GE INFORMATION SYSTEMS | Large load | — | MD | GENERAL ELECTRIC CO | — | EPA ICIS-Air |
| Built | GENERAL ELECTRIC, ROCKVILLE | Large load | — | MD | GENERAL ELECTRIC CO | — | EPA ICIS-Air |
Sources EPA ICIS-Air · EIA-860M
Assets 26
Assets
26
Capacity
6,465 MW
- Wind: 2,808 MW, 13 assets
- Gas, combined cycle: 2,398 MW, 5 assets
- Gas, combustion turbine: 1,063 MW, 3 assets
- Solar thermal: 171 MW, 2 assets
- Solar: 21.5 MW, 2 assets
- Oil: 4.4 MW, 1 asset
Operates 14 power plants · Owns 13 power plants
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 3
Companies
3
this one included
Parents
0
Subsidiaries
2
direct
Holding assets
3
of 3 companies in the group
-
General Electric CO This company 22 assets5,208.1 MWwith the companies below
-
GE Energy Financial Services Subsidiary · share not stated 3 assets1,220 MW
-
Shady Hills Power Co LLC Subsidiary · share not stated 1 asset541.2 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| General Electric CO | This company | 23 | power plant |
| GE Energy Financial Services | Subsidiary | 3 | power plant |
| Shady Hills Power Co LLC | Subsidiary | 1 | power plant |
Sources 6
Registers
6
Reuse terms
- 5 Open license
- 1 Open license, with credit
Latest read
2026-11-08
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EPA ICIS-Air ·
EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)
-
View at source →
EPA ICIS-Air ·
EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 76
within 15 mi (25 km outside the US)Projects
76
within 15 mi (25 km outside the US)
Nearest
0.0 mi
Shady Hills Generating Station
All 76NearbyShowing all 76 nearby projects. The 50 nearest are listed.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Shady Hills Generating Station | Gas, combustion turbine | 518 MW | 0.0 mi away | nearest: Shady Hills Generating Station |
| Under construction | Shady Hills Combined Cycle Facility | Gas, combined cycle | 612 MW | 0.0 mi away | nearest: Shady Hills Generating Station |
| Under construction | Pasco Cnty Solid Waste Resource Recovery | Waste to energy | 17 MW | 0.1 mi away | nearest: Shady Hills Generating Station |
| Canceled | Orion power station -- | Coal | 700 MW | 0.4 km away | nearest: Meghnaghat-II power station |
| Postponed | Trestles Grid LLC | Storage | 150 MW | 0.6 mi away | nearest: Inland Empire Energy Center |
| Postponed | Gateway Energy Center, LLC | Gas, combined cycle | 440 MW | 1.6 mi away | nearest: Parlin Power Plant |
| Postponed | Middlesex Energy Center LLC | Gas, combined cycle | 570 MW | 1.8 mi away | nearest: Parlin Power Plant |
| Announced | Sino Well wind farm -- | Wind | 50 MW | 3.6 km away | nearest: Jhimpir Power (Burj Capital) wind farm |
| Announced | New Caledonia | Gas, combustion turbine | 504 MW | 2.5 mi away | nearest: Caledonia |
| Announced | Maasvlakte floating solar farm -- | Solar | 96 MW | 4.2 km away | nearest: Haliade-X Massvlakte Prototype Onshore offshore wind farm |
| Canceled | China Sunec wind farm -- | Wind | 50 MW | 4.3 km away | nearest: Sapphire wind farm (Pakistan) |
| Announced | Maasvlakte Power Station (Onyx Power) 1, timepoint 2 | Biomass | 731 MW | 4.6 km away | nearest: Haliade-X Massvlakte Prototype Onshore offshore wind farm |
| Announced | Western Energy wind farm -- | Wind | 50 MW | 4.9 km away | nearest: Hawa Energy wind farm |
| Announced | Cacho wind farm -- | Wind | 50 MW | 5.6 km away | nearest: Sapphire-Tricon wind farm |
| Filed | Energizar BESS | Storage | 250 MW | 4.5 mi away | nearest: General Electric Aircraft Engines |
| Canceled | Munshiganj power station Phase I | Coal | 400 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station Phase II | Coal | 400 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Announced | Munshiganj power station 1 | Gas, combined cycle | 600 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station 2 | Gas, combined cycle | 660 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station 5 | Gas, combined cycle | 660 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station 4 | Gas, combined cycle | 660 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station 3 | Gas, combined cycle | 660 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Canceled | Munshiganj power station 6 | Gas, combined cycle | 660 MW | 7.8 km away | nearest: Meghnaghat-II power station |
| Announced | Monte Águila solar farm -- | Solar | 240 MW | 8.7 km away | nearest: Los Guindos power station |
| Announced | Sidon solar farm -- | Solar | 150 MW | 9.0 km away | nearest: Los Guindos power station |
| Under construction | Milltown Onsite BESS | Storage | 13.2 MW | 5.7 mi away | nearest: Parlin Power Plant |
| Canceled | Gazaria power station (RPCL) Unit 1 | Coal | 350 MW | 9.9 km away | nearest: Meghnaghat-II power station |
| Announced | Gazaria power station (RPCL) 1 | Gas, combined cycle | 600 MW | 9.9 km away | nearest: Meghnaghat-II power station |
| Announced | Gazaria power station (RPCL) 2 | Gas, combined cycle | 600 MW | 9.9 km away | nearest: Meghnaghat-II power station |
| Announced | Las Fresias wind farm -- | Wind | 310 MW | 10.4 km away | nearest: Los Guindos power station |
| Postponed | San Jacinto Solar | Solar | 1.5 MW | 7.0 mi away | nearest: Inland Empire Energy Center |
| Postponed | Lake Perris Solar | Solar | 1.5 MW | 7.1 mi away | nearest: Inland Empire Energy Center |
| Canceled | Beznau nuclear power plant 3 | Nuclear | 1,600 MW | 12.8 km away | nearest: Birr power station |
| Filed | 888 Ross Data Center | Large load | — | 8.2 mi away | nearest: Cardinal Cogen |
| Announced | Las Mellizas solar farm -- | Solar | 173 MW | 13.4 km away | nearest: Los Guindos power station |
| Under construction | Perris DC 5 - sline015 | Solar | 1.6 MW | 8.5 mi away | nearest: Inland Empire Energy Center |
| Canceled | Arabian Sea wind farm -- | Wind | 50 MW | 14.6 km away | nearest: Tenega Generasi wind farm |
| Announced | Dañicalqui wind farm -- | Wind | 95.2 MW | 15.1 km away | nearest: Los Guindos power station |
| Built | BARCLAYS CAPITAL DATA CENTER | Large load | — | 9.5 mi away | nearest: Parlin Power Plant |
| Built | EVOQUE DATA CENTER SOLUTIONS - PNJ1 | Large load | — | 9.5 mi away | nearest: Parlin Power Plant |
| Under construction | 7999 Gateway Solar | Solar | 4.6 MW | 9.8 mi away | nearest: Cardinal Cogen |
| Announced | Gateway#1&2 (Newark CA) | Solar | 1.1 MW | 9.9 mi away | nearest: Cardinal Cogen |
| Postponed | Amazon - Moreno Valley | Solar | 2.2 MW | 10.0 mi away | nearest: Inland Empire Energy Center |
| Postponed | Wildomar Solar | Solar | 1.2 MW | 10.4 mi away | nearest: Inland Empire Energy Center |
| Built | NJ 1 DATA CENTER | Large load | — | 10.6 mi away | nearest: Parlin Power Plant |
| Announced | Su Inziru solar farm -- | Solar | 95 MW | 17.9 km away | nearest: Su Scioffu solar farm |
| Under construction | Elevate Arthur Kill | Storage | 15.1 MW | 11.2 mi away | nearest: Parlin Power Plant |
| Postponed | Waste Management Tri-Cities LFGTE | Biomass | 4.8 MW | 11.4 mi away | nearest: Cardinal Cogen |
| Under construction | Prologis - SLCNJ001 - Community Solar | Solar | 3.2 MW | 11.5 mi away | nearest: Parlin Power Plant |
| Built | BLOOMBERG DATA CENTER | Large load | — | 11.6 mi away | nearest: Parlin Power Plant |
Sources EIA-860M · GEM · FAA OE/AAA · EPA ICIS-Air
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- FAA OE/AAA
- EPA ICIS-Air