Show on map
International Paper Hudson River Mill — Power plant · Gas, steam turbine · International Paper Co-HudsonRHillview — Under construction · Solar · NY · 5 MW · 13.3 mi awayBald Mountain Solar — Postponed · Solar · NY · 20 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

International Paper Hudson River Mill

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1969
Location
Saratoga County, New York
Operated by
International Paper Co-HudsonRSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
57 years since 1969

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2002
Capacity retired
38.4 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Steam Turbine38.4 MWRetiredOctober 2002

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 15 mi (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN1 scheduled to retire, 38.4 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hillview Under construction Solar 13.3 mi 5
Bald Mountain Solar Postponed Solar 15.0 mi 20

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026