Show on map
International Paper Lock Haven Mill — Power plant · Coal · INTERNATIONAL PAPER COJersey Shore Steel Co — Postponed · Biomass · PA · 1.6 MW · 5.3 mi awayGoonies Solar Project — Postponed · Solar · PA · 194 MW · 7.4 mi away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

International Paper Lock Haven Mill

Power plant · Coal

Key facts

Power plant · Coalran 52% of 2001 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1938
Net generation, 2001
159,360 MWh
Location
Clinton County, Pennsylvania
Operated by
International Paper COSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2002
Fuel burned MMBtu by year, 2001 to 2002
  • Coal
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
88 years since 1938

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2002
Capacity retired
34.7 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal5 MWRetiredMarch 2002
GEN3Conventional Steam Coal5 MWRetiredMarch 2002
GEN4Conventional Steam Coal24.7 MWRetiredMarch 2002

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN3, GEN4 scheduled to retire, 34.7 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Jersey Shore Steel Co Postponed Biomass 5.3 mi 1.6
Goonies Solar Project Postponed Solar 7.4 mi 194

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026