Show on map
IP Springfield Oregon — Power plant · Biomass · International Paper Corporation - Springfield
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

IP Springfield Oregon

Power plant · Biomass

Key facts

Power plant · Biomassran 63% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1976
Net generation, 2025
180,915 MWh
Grid
115 kV to City of Eugene - (OR) (BPAT)
Location
Lane County, Oregon

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
50 years since 1976
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
International Paper Co
Share pct
100
Gem entity id
E100000001241
Unit ids
G100000201675, G100001094063
Location id
L100000201392
Eia plant ids
50191
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110045589225
Subparts reported
AA, C
NAICS code
322130
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1002149
Fuel burned (MMBtu), 20256,986,844
Capacity factor, 20250.632
Net generation (MWh), 2025180,915.0
Balancing authority codeBPAT
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 38619.5 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
25 MW
Generators retired
3
Capacity still in service
32.7 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TG1Wood/Wood Waste Biomass7.5 MWRetiredDecember 2025
TG2Wood/Wood Waste Biomass5 MWRetiredDecember 2025
TG3Wood/Wood Waste Biomass12.5 MWRetiredDecember 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
City of Eugene - (OR)
Balancing authority
Bonneville Power Administration
NERC region
WECC
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
International Paper Corporation - Springfield Operator EIA-860M
INTERNATIONAL PAPER CO Owner 100.0% Dec 31, 2023 EPA GHGRP
Eugene Water & Electric Board Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Units TG1, TG2, TG3 scheduled to retire, 25 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source