Show on map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
IPC 25 Solar: location and 13 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
IPC 25 Solar
Power plant · Solar
Key facts
Power plant · Solarran 23% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- 4,926 MWh
- Grid
- 480 kV to Pacific Gas & Electric Co. (CISO)
- Location
- San Joaquin County, California
- Operated by
- Prologis Logistics Services Incorporated
Output
Details
Who’s behind it
- Owner
- ESCA-PLD-TRACY4, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 16,808 |
| Capacity factor, 2025 | 0.234 |
| Net generation (MWh), 2025 | 4,926 |
| Balancing authority code | CISO |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 6.6
- AC capacity (MW)
- 2.4
- DC capacity (MW)
- 3.1
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2024
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Prologis Logistics Services Incorporated | Operator | EIA-860M | ||
| ESCA-PLD-TRACY4, LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| TESLA Power Project Postponed | Gas, combined cycle | 1.9 mi | 1,322 |
| Tracy BESS Under construction | Storage | 3.2 mi | 40 |
| Zeus BESS Contracted | Storage | 3.3 mi | 200 |
| Sand Hill B Filed | Wind | 3.4 mi | 17 |
| Sand Hill C Contracted | Wind | 3.9 mi | 80.8 |
| Sand Hill A Filed | Wind | 3.9 mi | 13.5 |
| Mulqueeney Wind Energy Under construction | Wind | 4.1 mi | 80 |
| Rooney Ranch Filed | Wind | 6.3 mi | 21 |
| Tracy Renewable Power Plant Under construction | Biomass | 6.5 mi | 5 |
| Buena Vista Energy LLC Postponed | Storage | 8.4 mi | 100 |
| Tres Vaqueros Wind Farms LLC Withdrawn | Wind | 11.3 mi | 28.3 |
| Aramis I Solar Project × 2 units Under construction | Storage | 12.5 mi | 200 |