ITT Cogen Facility: location and 16 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
ITT Cogen Facility
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1991
- Net generation, 2025
- 0 MWh
- Grid
- 4 kV to Commonwealth Edison Co (PJM)
- Location
- Cook County, Illinois
- Operated by
- ITT Energy Tech Partners, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 35 years since 1991
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | PJM |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2024
- Capacity retired
- 7.4 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combustion Turbine | 3.7 MW | Retired | December 2024 |
| GEN2 | Natural Gas Fired Combustion Turbine | 3.7 MW | Retired | December 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 4 kV
- Transmission or distribution system owner
- Commonwealth Edison Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2 scheduled to retire, 7.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| ITT Cogen Facility Under construction | Gas, reciprocating engine | 0.0 mi | 8.2 |
| HYDRAVAULT LLC Built | Large load | 0.8 mi | |
| EQUINIX LLC Built | Large load | 1.4 mi | |
| QUALITY TECHNOLOGY SERVICES LLC Built | Large load | 2.0 mi | |
| TIERPOINT ILLINOIS LLC Built | Large load | 2.7 mi | |
| DIGITAL REALTY TRUST LP Built | Large load | 2.8 mi | |
| LEGACY GI 400 LASALLE LLC Unknown | Large load | 2.9 mi | |
| Cicero 3-SLCHI603 Under construction | Solar | 7.0 mi | 1.9 |
| McCook 2-SLCHI102 Under construction | Solar | 10.1 mi | 2 |
| Robbins Community Power LLC Postponed | Biomass | 13.3 mi | 55 |
| DLR 9311 (Franklin Park data centre) Filed | Large load | 13.5 mi | |
| DIGITAL GRAND AVENUE 3 LLC Built | Large load | 13.5 mi | |
| W Belmont Ave Under construction | Solar | 13.6 mi | 1.4 |
| FRANKLIN PARK (CHI22) DATA CENTER Built | Large load | 13.6 mi | |
| Franklin Park 2-SLCHI802 Under construction | Solar | 14.2 mi | 1.2 |
| IL - SMHEC - Moraine Valley Postponed | Solar | 14.4 mi | 1.3 |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA