Show on map
J.R. Simplot Company — Power plant · Other · J.R. Simplot CompanyStockton 9 - slcva209 — Under construction · Solar · CA · 1 MW · 5.9 mi awayNoosa Energy Storage LLC — Under construction · Storage · CA · 99 MW · 7.9 mi awayTracy Renewable Power Plant — Under construction · Biomass · CA · 5 MW · 8.4 mi awayStockton 1 - slcva801 — Under construction · Solar · CA · 1 MW · 9.6 mi awayZeus BESS — Contracted · Storage · CA · 200 MW · 13.3 mi awayTracy BESS — Under construction · Storage · CA · 40 MW · 13.3 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Unspecified fuel
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

J.R. Simplot Company

Power plant · Other

Key facts

Power plant · Otherran 25% of 2023 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2023
8,893 MWh
Location
San Joaquin County, California
Operated by
J.R. Simplot CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2024

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Other source: “All Other”
Age
33 years since 1993
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2024
Capacity retired
4 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1All Other4 MWRetiredJanuary 2024

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Connection points within 15 mi (2)
  • Ripon 115 kV CAISO · 115 kV · 1 request nearby, nearest 7.9 mi
  • Schulte 115 kV CAISO · 115 kV · 1 request nearby, nearest 13.3 mi
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Stockton 9 - slcva209 Under construction Solar 5.9 mi 1
Noosa Energy Storage LLC Under construction Storage 7.9 mi 99
Tracy Renewable Power Plant Under construction Biomass 8.4 mi 5
Stockton 1 - slcva801 Under construction Solar 9.6 mi 1
Zeus BESS Contracted Storage 13.3 mi 200
Tracy BESS Under construction Storage 13.3 mi 40

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Attribution