Show on map
J R Whiting - Samaria 138 kV — Transmission lineFDS Co-Generation Facility — Postponed · Gas, other · OH · 135 MW · 7.5 mi awayStrasburg Solar Park — Under construction · Solar · MI · 100 MW · 11.7 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

J R Whiting - Samaria 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-MI
Owner (as stated)
ITC Transmission

Details

Who’s behind it

Owner
ITC Transmission

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
12
Substations at the ends (as the source names them)
J R Whiting to Samaria
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states ititc transmission
HIFLD line ID118243
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
FDS Co-Generation Facility Postponed Gas, other 7.5 mi 135
Strasburg Solar Park Under construction Solar 11.7 mi 100

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution