J T Deely: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
J T Deely
Power plant · Coal
Key facts
Power plant · Coal Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1977
- Net generation, 2020
- -6,554 MWh
- Grid
- 138 kV to City of San Antonio - (TX) (ERCO)
- Location
- Bexar County, Texas
- Operated by
- City of San Antonio - (TX)
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- CPS Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 49 years since 1977
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | ERCO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2023
- Capacity retired
- 932 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 486 MW | Retired | January 2023 |
| 2 | Conventional Steam Coal | 446 MW | Retired | January 2023 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- City of San Antonio - (TX)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 15 mi (10)
- Power line, voltage not stated (OSM way 342839449)
- 138 kV line (OSM way 342839466)
- Power line, voltage not stated (OSM way 342839445)
- 138 kV line (OSM way 174509100)
- 138 kV line (OSM way 174509118)
- Power line, voltage not stated (OSM way 342839453)
- 138 kV line (OSM way 174509106)
- 138 kV line (OSM way 342839472)
- Power line, voltage not stated (OSM way 342839459)
- 138 kV line (OSM way 174509097)
Connection points within 15 mi (4)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of San Antonio - (TX) | Operator | EIA-860M | ||
| CPS Energy | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2 scheduled to retire, 932 MW · EIA-860M
- In service · EIA-860M
Sources
7 sourcesSources EIA-860M · GEM · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
© OpenStreetMap contributors
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- ERCOT
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Padua 3 Under construction | Storage | 1.2 mi | 200 |
| Rush ESS Studied | Storage | 1.6 mi | 201.3 |
| Alamo City ESS Contracted | Storage | 2.6 mi | 128.2 |
| El Patrimonio Contracted | Solar | 12.2 mi | 152.3 |