Show on map
Java Solar, LLC — Power plant · Solar · Java Solar, LLCGrape — Solar · CA · 246.4 MW · 12.6 km awayCherry — Solar + storage · CA · 359.7 MW · 15.6 km awaySand Luis West — Solar + storage · CA · 156.3 MW · 22.6 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Java Solar, LLC

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
22,490 MWh
Grid
115 kV to Pacific Gas & Electric Co. (CISO)
Location
Kings County, California
Operated by
Java Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838628
Location id
L100000833000
Eia plant ids
65965
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202576,737
Capacity factor, 20250.190
Net generation (MWh), 202522,490
Balancing authority codeCISO

Solar arrays

Array area (acres)
69.8
AC capacity (MW)
13.5
DC capacity (MW)
18.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Grape Under construction Solar 12.6 km 246.4
Cherry Permitted Solar + storage 15.6 km 359.7
Sand Luis West Permitted Solar + storage 22.6 km 156.3

Sources EIA-860M

Sources

Attribution