Key facts

Power plant · Hydroran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1942
Net generation, 2025
233,504 MWh
Grid
115 kV to South Carolina Public Service Authority (SC)
Location
Berkeley County, South Carolina

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
84 years since 1942
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000603868
Location id
L100000603830
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002232281
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000914
Fuel burned (MMBtu), 2025796,716
Capacity factor, 20250.184
Net generation (MWh), 2025233,504
Balancing authority codeSC
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 3412.0 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
445.6 MW
Generators retired
4
Capacity still in service
145.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Conventional Steam Coal172.8 MWRetiredDecember 2012
4Conventional Steam Coal172.8 MWRetiredDecember 2012
1Petroleum Liquids50 MWRetiredOctober 2015
2Petroleum Liquids50 MWRetiredOctober 2015
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal345.6 MW
Petroleum Liquids100 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
South Carolina Public Service Authority
Balancing authority
South Carolina Public Service Authority
NERC region
SERC
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
South Carolina Public Service Authority Operator EIA-860M
Santee Cooper Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 100 MW · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 345.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Pinopolis BESS Filed Storage 0.6 km 300
MAGURO ENTERPRISES LLC Built Large load 18.7 km