Show on map
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Other infrastructure
Jefferson - Hanging Rock 765 kV: route and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Jefferson - Hanging Rock 765 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 765 kV
- States crossed
- US-IN, US-KY, US-OH
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 160
- Substations at the ends (as the source names them)
- Jefferson to Hanging Rock
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 114236 |
| Voltage class | 735 kV and above |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Flag Run Solar Filed | Solar | 2.8 mi | 200 |
| AEUG Fleming Solar, LLC Under construction | Solar | 9.4 mi | 188.5 |
| SunCoke Energy South Shore Facility Postponed | Coal | 9.6 mi | 90 |
| Green Valley LFGTE Postponed | Biomass | 12.0 mi | 0.8 |
| Blue Moon Under construction | Solar | 13.3 mi | 70 |
Sources EIA-860M