- Combustion
- Loads
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
Jefferson Smurfit JSC: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Jefferson Smurfit JSC
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1934
- Location
- Philadelphia County, Pennsylvania
- Operated by
- Jefferson Smurfit CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 92 years since 1934
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2004
- Capacity retired
- 12 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 6 MW | Retired | January 2004 |
| 2 | Petroleum Liquids | 6 MW | Retired | January 2004 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2 scheduled to retire, 12 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| 365 DATA CENTERS Built | Large load | 5.6 mi | |
| H5 DATA CENTERS Built | Large load | 5.6 mi | |
| CROSS CONNECT SOLUTIONS Built | Large load | 5.8 mi | |
| EQUINIX Unknown | Large load | 5.8 mi | |
| INNOVATION 2201 LLC / UPPER MERION TWP Built | Large load | 7.1 mi | |
| CSL BEHRING DATA CTR/KING OF PRUSSIA Built | Large load | 10.8 mi | |
| VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE Built | Large load | 12.1 mi | |
| West Point (PA) Under construction | Gas, reciprocating engine | 13.7 mi | 2.5 |
Sources EPA ICIS-Air · EIA-860M