Jetmore — Power plant · Oil · City of Jetmore -(KS)Salt Springs Wind Farm — Wind · KS · 200 MW · 18.3 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
126 MWh
Grid
69 kV to Midwest Energy Inc (SWPP)
Location
Hodgeman County, Kansas
Operated by
City of Jetmore -(KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
11 years since 2015
Heat rate
11,413 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
2.50
Units
1
Standby mw
2.50
Status rule
majority_mw_standby
In service mw
2.50
Out of service mw
0
Fuel burned (MMBtu), 20251,438
Capacity factor, 20250.006
Heat rate (Btu/kWh), 202511,412.7
Net generation (MWh), 2025126
Balancing authority codeSWPP

Retirement

Capacity retired
6 MW
Generators retired
7
Capacity still in service
2.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids0.2 MWRetiredJanuary 2010
4Petroleum Liquids0.8 MWRetiredJanuary 2010
1Petroleum Liquids1 MWRetiredDecember 2014
2Petroleum Liquids0.4 MWRetiredDecember 2014
5Petroleum Liquids1.5 MWRetiredDecember 2014
6Petroleum Liquids1.2 MWRetiredDecember 2014
7Petroleum Liquids0.9 MWRetiredDecember 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Midwest Energy Inc
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • In service · EIA-860M
  • Stated Units 1, 2, 5, 6, 7 scheduled to retire, 5 MW · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 1 MW · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Salt Springs Wind Farm Postponed Wind 18.3 km 200

Sources EIA-860M

Sources

Attribution