Show on map
Jewett City 1 — Power plant · Oil · Connecticut Mun Elec Engy Coop
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Jewett City 1

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
139 MWh
Grid
4 kV to City of Jewett City - (CT) (ISNE)
Location
New London County, Connecticut
Operated by
Connecticut Mun Elec Engy CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
139MWh
Fuel burned, 2025
1,379MMBtu
Capacity factor, 2025
0.6%
Heat rate, 2025
9,921Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20251391,3790.6%9,921
20242051,7740.9%8,654
20231981,9560.9%9,879
20222152,1180.9%9,851
20212452,4241.1%9,894
20203133,2481.4%10,377
20192312,3051.0%9,978
20182432,4431.1%10,054
20172812,8241.2%10,050
20163143,1771.4%10,118
20153703,7131.6%10,035
20143473,5151.5%10,130
20132812,8881.2%10,278
20122032,0830.9%10,261
20112182,0821.0%9,550
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source