JLL-One Rockwood Road — Power plant · Oil · JLL-One Rockwood RoadORANGETOWN DATA CENTER — Built · Large load · NY · 7.1 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 7.8 mi awayBowline Point — Postponed · Gas, combined cycle · NY · 750 MW · 8.6 mi away
  • Combustion
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

JLL-One Rockwood Road

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
13 MWh
Grid
0.5 kV to Consolidated Edison Co-NY Inc (NYIS)
Location
Westchester County, New York
Operated by
JLL-One Rockwood RoadSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
23 years since 2003
Heat rate
15,846 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Consolidated Edison Co-NY Inc
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
Eia status
By code
SB
Mw
3
Units
2
Standby mw
3
Status rule
majority_mw_standby
In service mw
3
Out of service mw
0
Fuel burned (MMBtu), 2025206
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202515,846.2
Net generation (MWh), 202513
Balancing authority codeNYIS

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ORANGETOWN DATA CENTER Built Large load 7.1 mi
DATA CENTER BUILDING EXPANSION Under construction Large load 7.8 mi
Bowline Point Postponed Gas, combined cycle 8.6 mi 750

Sources EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M