Johanna Energy Center, LLC — Power plant · Storage · Johanna Energy Center, LLCSanta Ana Storage 3 — Postponed · Storage · CA · 40 MW · 0.0 mi awaySolar Photovoltaic Project #47 — Postponed · Solar · CA · 1 MW · 3.6 mi awayVS HR Warner NEM, LLC — Under construction · Solar · CA · 1 MW · 4.6 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 9.9 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Johanna Energy Center, LLC

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
-11,785 MWh
Grid
69 kV to Southern California Edison Co (CISO)
Location
Orange County, California
Operated by
Johanna Energy Center, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-11,785
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -11785.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Santa Ana Storage 3 Postponed Storage 0.0 mi 40
Solar Photovoltaic Project #47 Postponed Solar 3.6 mi 1
VS HR Warner NEM, LLC Under construction Solar 4.6 mi 1
Westminster Reliability Project, LLC Under construction Storage 9.9 mi 110

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution