Show on map
Johnson — Power plant · Oil · City of Johnson - (KS)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
28 MWh
Grid
14 kV to Pioneer Electric Coop, Inc - (KS) (SWPP)
Location
Stanton County, Kansas
Operated by
City of Johnson - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
9 years since 2017
Unused energy
53 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,893 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025361
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202512,892.9
Net generation (MWh), 202528
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
6.5 MW
Generators retired
7
Capacity still in service
6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.6 MWRetiredAugust 2017
2Petroleum Liquids0.9 MWRetiredAugust 2017
4Petroleum Liquids0.5 MWRetiredAugust 2017
5Petroleum Liquids0.3 MWRetiredAugust 2017
7Petroleum Liquids1.5 MWRetiredAugust 2017
8Natural Gas Internal Combustion Engine1.2 MWRetiredAugust 2017
IC6Petroleum Liquids1.5 MWRetiredAugust 2017
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Petroleum Liquids5.3 MW
Natural Gas Internal Combustion Engine1.2 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Pioneer Electric Coop, Inc - (KS)
Balancing authority
Southwest Power Pool
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 4, 5, 7, 8, IC6 scheduled to retire, 6.5 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source