Johnson: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Johnson
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 28 MWh
- Grid
- 14 kV to Pioneer Electric Coop, Inc - (KS) (SWPP)
- Location
- Stanton County, Kansas
- Operated by
- City of Johnson - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 9 years since 2017
- Unused energy
- 53 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 12,893 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 361 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 12,892.9 |
| Net generation (MWh), 2025 | 28 |
| Balancing authority code | SWPP |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 6.5 MW
- Generators retired
- 7
- Capacity still in service
- 6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 0.6 MW | Retired | August 2017 |
| 2 | Petroleum Liquids | 0.9 MW | Retired | August 2017 |
| 4 | Petroleum Liquids | 0.5 MW | Retired | August 2017 |
| 5 | Petroleum Liquids | 0.3 MW | Retired | August 2017 |
| 7 | Petroleum Liquids | 1.5 MW | Retired | August 2017 |
| 8 | Natural Gas Internal Combustion Engine | 1.2 MW | Retired | August 2017 |
| IC6 | Petroleum Liquids | 1.5 MW | Retired | August 2017 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Petroleum Liquids | 5.3 MW | |
| Natural Gas Internal Combustion Engine | 1.2 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Pioneer Electric Coop, Inc - (KS)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 4, 5, 7, 8, IC6 scheduled to retire, 6.5 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory