Jordanelle Dam Hydroelectric Project
Power plant · Hydro
Key facts
Power plant · Hydroran 43% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2008
- Net generation, 2025
- 49,274 MWh
- Grid
- 12 kV to Heber Light & Power Company (PACE)
- Location
- Wasatch County, Utah
- Operated by
- Central Utah Water Conservancy DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 49,274
MWh - Fuel burned, 2025
- 168,121
MMBtu - Capacity factor, 2025
- 43.3
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 49,274 | 168,121 | 43.3% | — |
| 2024 | 50,971 | 173,915 | 44.6% | — |
| 2023 | 50,046 | 170,758 | 44.0% | — |
| 2022 | 31,145 | 106,265 | 27.4% | — |
| 2021 | 34,650 | 306,445 | 30.4% | — |
| 2020 | 49,219 | 431,502 | 43.1% | — |
| 2019 | 46,103 | 410,548 | 40.5% | — |
| 2018 | 47,619 | 433,526 | 41.8% | — |
| 2017 | 50,215 | 462,629 | 44.1% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.