Show on map
Junction BESS — Power plant · Storage · SBESS TX5 LLC
  • Storage
  • Operating
  • 10 · 100 · 1,000 MW

Junction BESS

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
-1,057 MWh
Grid
25 kV to Pedernales Electric Coop, Inc (ERCO)
Location
Kimble County, Texas
Operated by
Sbess TX5 LLC

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
24.90
Transmission owner
Pedernales Electric Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-1,057
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -1057.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
SBESS TX5 LLC Operator EIA-860M
Adapture Solar Investments 6, LLC Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M