Juniata Locomotive Shop — Power plant · Gas, combustion turbine · Norfork Southern Corp
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Juniata Locomotive Shop

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
0 MWh
Grid
12 kV to Pennsylvania Electric Co (PJM)
Location
Blair County, Pennsylvania

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
11 years since 2015
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110064195240
NAICS code
488210
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1002572
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codePJM
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
4 MW
Generators retired
2
Capacity still in service
1.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal2 MWRetiredApril 2015
GEN2Conventional Steam Coal2 MWRetiredApril 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Pennsylvania Electric Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Norfork Southern Corp Operator EIA-860M
NORFOLK SOUTHERN RAILWAY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source