Kahului
Power plant · Oil
Key facts
Power plant · Oilran 51% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1948
- Net generation, 2025
- 152,123 MWh
- Grid
- 23 kV to Maui Electric Co Ltd
- Location
- Maui County, Hawaii
- Operated by
- Maui Electric Co Ltd
Output
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 78 years since 1948
- Heat rate
- 14,856 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 2,259,877 |
| Capacity factor, 2025 | 0.511 |
| Heat rate (Btu/kWh), 2025 | 14,855.6 |
| Net generation (MWh), 2025 | 152,123 |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2028
- Capacity scheduled to retire
- 34 MW
- Generators scheduled to retire
- 4
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 34 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 5 MW | Scheduled to retire | December 2028 |
| 2 | Petroleum Liquids | 5 MW | Scheduled to retire | December 2028 |
| 3 | Petroleum Liquids | 11.5 MW | Scheduled to retire | December 2028 |
| 4 | Petroleum Liquids | 12.5 MW | Scheduled to retire | December 2028 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 23 kV
- Transmission or distribution system owner
- Maui Electric Co Ltd
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Maui Electric Co Ltd | Operator | EIA-860M | ||
| HAWAIIAN ELECTRIC INDUSTRIES INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2, 3, 4 scheduled to retire, 34 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Kuihelani Phase 2 Filed | Solar | 6.9 mi | 40 |
| Kahana Solar, LLC Postponed | Solar + storage | 13.0 mi | 40 |
| Paeahu Solar Hybrid Postponed | Solar + storage | 14.9 mi | 30 |
Sources EIA-860M