Show on map
Kankakee Hydro Facility — Power plant · Hydro · City of Kankakee - (IL)SV CSG Manteno — Permitted · Solar + storage · IL · 10 MW · 7.5 mi awaySV CSG St Anne 1 — Permitted · Solar · IL · 5 MW · 10.1 mi awayKA 340 — Under construction · Solar · IL · 5 MW · 10.9 mi away
  • Clean firm
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Kankakee Hydro Facility

Power plant · Hydro

Key facts

Power plant · Hydro Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1991
Net generation, 2025
0 MWh
Grid
12 kV to Commonwealth Edison Co (PJM)
Location
Kankakee County, Illinois
Operated by
City of Kankakee - (IL)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
35 years since 1991
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Eia status
By code
OS
Mw
1.20
Units
3
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
1.20
Out of service mw
1.20
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codePJM
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SV CSG Manteno Permitted Solar + storage 7.5 mi 10
SV CSG St Anne 1 Permitted Solar 10.1 mi 5
KA 340 Under construction Solar 10.9 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution