Kegonsa - Mcfarland 138 kV — Transmission lineNine Springs Solar — Under construction · Solar · WI · 8 MW · 4.8 mi awayUW Madison Charter Street Plant — Postponed · Biomass · WI · 22 MW · 7.4 mi awayKoshkonong Solar Energy Center LLC — Under construction · Solar · WI · 300 MW · 8.1 mi awaySunnyside Solar Energy Center — Under construction · Solar + storage · WI · 60 MW · 8.7 mi awayVienna Walbec Customer Hosted — Under construction · Solar · WI · 1.4 MW · 14.5 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Kegonsa - Mcfarland 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-WI

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Kegonsa to Mcfarland
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID145436
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Nine Springs Solar Under construction Solar 4.8 mi 8
UW Madison Charter Street Plant Postponed Biomass 7.4 mi 22
Koshkonong Solar Energy Center LLC Under construction Solar 8.1 mi 300
Sunnyside Solar Energy Center Under construction Solar + storage 8.7 mi 60
Vienna Walbec Customer Hosted Under construction Solar 14.5 mi 1.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution