Show on map
Kellam Solar — Power plant · Solar · Kellam Solar, LLCMcgee Storage — Postponed · Storage · TX · 151.3 MW · 9.5 mi awayOld Jackson Solar LLC — Postponed · Solar · TX · 128 MW · 14.0 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Kellam Solar

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
110,615 MWh
Grid
138 kV to East Texas Electric Coop, Inc (ERCO)
Location
Van Zandt County, Texas

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805856
Location id
L100000805079
Eia plant ids
62774
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
East Texas Electric Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025377,418
Capacity factor, 20250.214
Net generation (MWh), 2025110,615
Balancing authority codeERCO

Solar arrays

Array area (acres)
279.2
AC capacity (MW)
59.8
DC capacity (MW)
81
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Kellam Solar, LLC Operator EIA-860M
RBC-Kellam Holding Company, LLC Owner 31.6% Dec 31, 2025 EIA-860
ENI New Energy US Inc Owner 68.4% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mcgee Storage Postponed Storage 9.5 mi 151.3
Old Jackson Solar LLC Postponed Solar 14.0 mi 128

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution