Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Kenai: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kenai
Gas storage site · Depleted field
Key facts
Gas storage site · Depleted field Operating- Location
- Kenai Peninsula County, Alaska
- Operated by
- Hilcorp Alaska LLC
Details
Who’s behind it
- Owner
- Hilcorp Energy Co.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Depleted field source: “Depleted Field”
- Capacity (Mcf)
- 51,717,583
Capacity not stated
All 14 attributes from EIA US Energy Atlas — Natural Gas Underground Storage (fields; operator, working gas capacity, field type)
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Source period | 202012 |
| Region | Alaska |
| Reservoir | STERLING POOL 6 |
| EIA field code | 374014 |
| Field type | Depleted Field |
| Status, as the source states it | Active |
| Base gas (Mcf) | 5,967,413 |
| Operator, as the source states it | HILCORP ALASKA LLC |
| EIA reservoir code | 133 |
| Source release | 202012 |
| Maximum deliverability (Mcf/d) | 60,000 |
| Total field capacity (Mcf) | 57,684,997 |
| Working gas capacity (Mcf) | 51,717,583 |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Hilcorp Energy Co. | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| HILCORP ALASKA LLC | Operator | EIA Energy Atlas |
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Soldotna Postponed | Gas, combustion turbine | 9.6 mi | 50 |
| Tesoro Kenai Cogeneration Plant Postponed | Gas, combustion turbine | 14.4 mi | 7.8 |
Sources EIA-860M