Show on map
Kennett — Power plant · Oil · City of Kennett - (MO)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2025
1,254 MWh
Grid
69 kV to City of Kennett - (MO) (SWPP)
Location
Dunklin County, Missouri
Operated by
City of Kennett - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
61 years since 1965
Unused energy
274 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025508
Capacity factor, 20250.005
Net generation (MWh), 20251,254
Balancing authority codeSWPP
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 405.1 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
13.1 MW
Generators retired
8
Capacity still in service
31.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.4 MWRetiredDecember 2019
2Petroleum Liquids0.4 MWRetiredDecember 2019
3Petroleum Liquids0.8 MWRetiredDecember 2019
4Natural Gas Internal Combustion Engine2.5 MWRetiredDecember 2019
5Petroleum Liquids1.4 MWRetiredDecember 2019
6Natural Gas Internal Combustion Engine2 MWRetiredDecember 2019
7Natural Gas Internal Combustion Engine2.5 MWRetiredDecember 2019
8Natural Gas Internal Combustion Engine3.1 MWRetiredDecember 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine10.1 MW
Petroleum Liquids3 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Kennett - (MO)
Balancing authority
Southwest Power Pool
NERC region
SERC
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5, 6, 7, 8 scheduled to retire, 13.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution