Show on map
Kerr Dam 115 kV line — Transmission lineMICROSOFT CORP - LVL DATA CENTER — Built · Large load · VA · 3.5 mi awayMICROSOFT CORPORATION - EAST COAST DATA CENTER — Built · Large load · VA · 4.5 mi awayBN80 DATA CENTER — Built · Large load · VA · 4.9 mi awayMICROSOFT CORP - LYH10 DATACENTER — Built · Large load · VA · 5.2 mi awayMICROSOFT CORP - AVC17 DATACENTER — Built · Large load · VA · 5.6 mi awayMICROSOFT CORPORATION - TIMBER DATA CENTER — Built · Large load · VA · 5.7 mi awayMICROSOFT AVC19 DATA CENTER AUXILIARY SITE — Under construction · Large load · VA · 5.9 mi awayTECFUSIONS CLARKSVILLE LLC — Built · Large load · VA · 6.1 mi awayBloomsbury Solar, LLC — Postponed · Solar · NC · 5 MW · 11.7 mi awayMicrosoft Corporation - LYH03 Datacenter — Filed · Large load · VA · 11.8 mi awayRoman Solar — Postponed · Solar · NC · 5 MW · 11.9 mi awayMICROSOFT CORPORATION - AVC43 DATACENTER — Built · Large load · VA · 12.2 mi awayBlue Bird Solar — Postponed · Solar · NC · 4 MW · 14.1 mi awayMICROSOFT CORPORATION - AVC DATA CENTER — Built · Large load · VA · 14.7 mi awaySpring Valley Farm — Postponed · Solar · NC · 5 MW · 14.7 mi awayMICROSOFT CORP DCS - AVC09-AVC13 DATACENTER — Built · Large load · VA · 14.7 mi away
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Kerr Dam 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-VA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
10
Substations at the ends (as the source names them)
Kerr Dam
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID125457
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MICROSOFT CORP - LVL DATA CENTER Built Large load 3.5 mi
MICROSOFT CORPORATION - EAST COAST DATA CENTER Built Large load 4.5 mi
BN80 DATA CENTER Built Large load 4.9 mi
MICROSOFT CORP - LYH10 DATACENTER Built Large load 5.2 mi
MICROSOFT CORP - AVC17 DATACENTER Built Large load 5.6 mi
MICROSOFT CORPORATION - TIMBER DATA CENTER Built Large load 5.7 mi
MICROSOFT AVC19 DATA CENTER AUXILIARY SITE Under construction Large load 5.9 mi
TECFUSIONS CLARKSVILLE LLC Built Large load 6.1 mi
Bloomsbury Solar, LLC Postponed Solar 11.7 mi 5
Microsoft Corporation - LYH03 Datacenter Filed Large load 11.8 mi
Roman Solar Postponed Solar 11.9 mi 5
MICROSOFT CORPORATION - AVC43 DATACENTER Built Large load 12.2 mi
Blue Bird Solar Postponed Solar 14.1 mi 4
MICROSOFT CORPORATION - AVC DATA CENTER Built Large load 14.7 mi
Spring Valley Farm Postponed Solar 14.7 mi 5
MICROSOFT CORP DCS - AVC09-AVC13 DATACENTER Built Large load 14.7 mi

Sources Virginia DEQ · EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution