Kerr Dam 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-VA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 6
- Substations at the ends (as the source names them)
- Kerr Dam
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 165809 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| MICROSOFT CORP - LVL DATA CENTER Built | Large load | 5.5 mi | |
| MICROSOFT CORP - LYH10 DATACENTER Built | Large load | 6.2 mi | |
| MICROSOFT CORPORATION - EAST COAST DATA CENTER Built | Large load | 6.5 mi | |
| BN80 DATA CENTER Built | Large load | 7.0 mi | |
| MICROSOFT CORPORATION - TIMBER DATA CENTER Built | Large load | 7.5 mi | |
| Roman Solar Postponed | Solar | 7.9 mi | 5 |
| Bloomsbury Solar, LLC Postponed | Solar | 10.0 mi | 5 |
| MICROSOFT CORPORATION - AVC43 DATACENTER Built | Large load | 10.4 mi | |
| MICROSOFT CORP DCS - AVC09-AVC13 DATACENTER Built | Large load | 12.0 mi | |
| MICROSOFT CORP - AVC17 DATACENTER Built | Large load | 12.1 mi | |
| MICROSOFT AVC19 DATA CENTER AUXILIARY SITE Under construction | Large load | 12.2 mi | |
| MICROSOFT CORPORATION - AVC DATA CENTER Built | Large load | 13.2 mi | |
| TECFUSIONS CLARKSVILLE LLC Built | Large load | 13.8 mi | |
| Blue Bird Solar Postponed | Solar | 14.8 mi | 4 |
| BRE NC Solar 4 Postponed | Solar | 14.9 mi | 5 |
| Microsoft Corporation - LYH03 Datacenter Filed | Large load | 15.0 mi |