Show on map
Khavda (Adani) IV solar farm — Power plant · SolarKhavda (SAEL) solar farm -- — Under construction · Solar · India · 800 MW · 3.5 km awayKutch (NTPC) Solar Park 2 — Under construction · Solar · India · 1,200 MW · 6.9 km awayKutch (NTPC) Solar Park 1 — Under construction · Solar · India · 1,255 MW · 6.9 km awayKutch (NTPC) Solar Park 5 — Under construction · Solar · India · 275 MW · 6.9 km awayKutch (NTPC) Solar Park 4 — Under construction · Solar · India · 1,200 MW · 6.9 km awayKutch (NTPC) Solar Park 3 — Under construction · Solar · India · 300 MW · 6.9 km awayKutch (NTPC) Solar Park 6 — Under construction · Solar · India · 275 MW · 6.9 km awayKutch (NTPC) Solar Park 7 — Under construction · Solar · India · 245 MW · 6.9 km awayGIPCL RE Park Ph-I solar farm -- — Under construction · Solar · India · 600 MW · 10.2 km awayGIPCL RE Park Ph-III solar farm -- — Under construction · Solar · India · 575 MW · 10.2 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Khavda (Adani) IV solar farm

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Gujarat, India

Details

Who’s behind it

Owner
Adani Renewable Energy Holding Four LtdSourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “utility-scale solar / PV”
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
Adani Renewable Energy Holding Four Ltd
Unit ids
G100001074051
Location id
L100001064368
Subnational
Gujarat
Unit statuses
Operating
1
Location accuracy
approximate

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Khavda (SAEL) solar farm -- Under construction Solar 3.5 km 800
Kutch (NTPC) Solar Park 2 Under construction Solar 6.9 km 1,200
Kutch (NTPC) Solar Park 1 Under construction Solar 6.9 km 1,255
Kutch (NTPC) Solar Park 5 Under construction Solar 6.9 km 275
Kutch (NTPC) Solar Park 4 Under construction Solar 6.9 km 1,200
Kutch (NTPC) Solar Park 3 Under construction Solar 6.9 km 300
Kutch (NTPC) Solar Park 6 Under construction Solar 6.9 km 275
Kutch (NTPC) Solar Park 7 Under construction Solar 6.9 km 245
GIPCL RE Park Ph-I solar farm -- Under construction Solar 10.2 km 600
GIPCL RE Park Ph-III solar farm -- Under construction Solar 10.2 km 575

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution