Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2006
0 MWh
Location
Logan County, Illinois
Operated by
Central Illinois Light CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2006
Fuel burned MMBtu by year, 2003 to 2006
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
26 years since 2000

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2005
Capacity retired
12.8 MW
Generators retired
8
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids1.6 MWRetiredSeptember 2005
2Petroleum Liquids1.6 MWRetiredSeptember 2005
3Petroleum Liquids1.6 MWRetiredSeptember 2005
4Petroleum Liquids1.6 MWRetiredSeptember 2005
5Petroleum Liquids1.6 MWRetiredSeptember 2005
6Petroleum Liquids1.6 MWRetiredSeptember 2005
7Petroleum Liquids1.6 MWRetiredSeptember 2005
8Petroleum Liquids1.6 MWRetiredSeptember 2005

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5, 6, 7, 8 scheduled to retire, 12.8 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Dragon's Breath Solar LLC PV Under construction Solar 3.6 km 5
Fast Ave Solar LLC Under construction Solar 17.3 km 5
Pivot Energy IL 7 LLC Under construction Solar 19.2 km 1.4