Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
Kilgore: route and 21 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kilgore
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- SunocoSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 190
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Kilgore |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Nacogdoches Power Postponed | Gas, combined cycle | 0.6 mi | 925 |
| Lone Star Power Station Studied | Gas, other | 1.3 mi | 478 |
| TX LaPort 10060 Porter Road Solar Postponed | Solar | 4.7 mi | 1.6 |
| Greens Bayou 6 Under construction | Gas, combustion turbine | 6.1 mi | 445 |
| Banita Creek- Spindlepop Solar Under construction | Solar + storage | 6.2 mi | 673.9 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 6.7 mi | 900 |
| TX Houston 7080 Express Lane Postponed | Storage | 7.9 mi | 1.5 |
| Noor Solar Filed | Solar | 8.2 mi | 188.2 |
| NET Power La Porte Station Studied | Gas, combustion turbine | 8.2 mi | 25.5 |
| Texas Petrochemicals Postponed | Gas, combined cycle | 8.6 mi | 560 |
| GCCISD NEW TECHNOLOGY DATA CENTER Unknown | Large load | 9.3 mi | |
| Triune Solar Announced | Solar | 11.1 mi | 100 |
| Coneflower Storage Project LLC Contracted | Storage | 11.1 mi | 170.8 |
| Cedar Bayou 5 Under construction | Gas, combustion turbine | 12.1 mi | 697 |
| ELLIOTT ELECTRIC STORE AND DATA CENTER Unknown | Large load | 12.7 mi | |
| Pinecrest Energy Center Postponed | Gas, combined cycle | 12.7 mi | 753 |
| Baytown Postponed | Biomass | 13.6 mi | 1.3 |
| Lupinus Solar 1, LLC Under construction | Solar + storage | 13.7 mi | 246.3 |
| Lupinus Solar 2, LLC Contracted | Solar + storage | 13.7 mi | 366.9 |
| Sun Angel ESS Studied | Storage | 14.4 mi | 201.5 |
| SMT DC Houston II (Houston data centre) Filed | Large load | 14.5 mi |
Sources EIA-860M · Berkeley Lab · ERCOT · EPA ICIS-NPDES · FAA OE/AAA
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- ERCOT
- EPA ICIS-NPDES
- FAA OE/AAA