Show on map
Klondike 230 kV line — Transmission lineDeKalb County Green Energy Facility — Postponed · Biomass · GA · 1.6 MW · 1.5 mi awayTA Reality Ellenwood Data Center — Filed · Large load · GA · 4.5 mi awayDCB ATLANTA EAST, LLC — Built · Large load · GA · 5.9 mi awayFT GIllem MASE Crane (Forest Park data centre) — Filed · Large load · GA · 6.2 mi awayDATA CENTER ATLANTA, LLC — Built · Large load · GA · 12.2 mi awayQUALITY INVESTMENT PROPERTIES METRO, LLC — Built · Large load · GA · 13.7 mi away
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Klondike 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-GA
Owner (as stated)
Georgia Power

Details

Who’s behind it

Owner
Georgia Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
6
Substations at the ends (as the source names them)
Klondike
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itgeorgia power
HIFLD line ID136699
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DeKalb County Green Energy Facility Postponed Biomass 1.5 mi 1.6
TA Reality Ellenwood Data Center Filed Large load 4.5 mi
DCB ATLANTA EAST, LLC Built Large load 5.9 mi
FT GIllem MASE Crane (Forest Park data centre) Filed Large load 6.2 mi
DATA CENTER ATLANTA, LLC Built Large load 12.2 mi
QUALITY INVESTMENT PROPERTIES METRO, LLC Built Large load 13.7 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES · EPA ICIS-Air

Sources

Attribution