Klondike - Ohara 500 kV: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Klondike - Ohara 500 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 500 kV
- States crossed
- US-GA
- Owner (as stated)
- Georgia Power
Details
Who’s behind it
- Owner
- Georgia Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 24
- Substations at the ends (as the source names them)
- Klondike to Ohara
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | georgia power |
| HIFLD line ID | 115182 |
| Voltage class | 500 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DCB ATLANTA EAST, LLC Built | Large load | 5.9 mi | |
| DC-1 (Hampton data centre) Filed | Large load | 7.1 mi | |
| DeKalb County Green Energy Facility Postponed | Biomass | 7.7 mi | 1.6 |
| QTS DC11 Data Center Filed | Large load | 8.7 mi | |
| QTS DC4 Data Center Filed | Large load | 9.6 mi | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 10.1 mi | |
| TA Reality Ellenwood Data Center Filed | Large load | 10.7 mi | |
| VANTAGE DATA CENTERS GA1, LLC Under construction | Large load | 12.7 mi | |
| ATL06 DATA CENTER Under construction | Large load | 13.9 mi | |
| EDGECONNEX ATL11, LLC Filed | Large load | 14.8 mi |
Sources EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA · EIA-860M · Georgia EPD
Sources
- EPA ICIS-NPDES
- EPA ICIS-Air
- FAA OE/AAA
- EIA-860M
- Georgia EPDSource: Georgia Environmental Protection Division, Air Protection Branch