- Clean firm
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
KMS Joliet Power Partners LP: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
KMS Joliet Power Partners LP
Power plant · Biomass
Key facts
Power plant · Biomassran 20% of 2004 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1997
- Net generation, 2004
- 5,554 MWh
- Location
- Will County, Illinois
- Operated by
- DTE BiomassSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 29 years since 1997
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2005
- Capacity retired
- 3.2 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| E-1 | Landfill Gas | 0.8 MW | Retired | December 2005 |
| E-2 | Landfill Gas | 0.8 MW | Retired | December 2005 |
| E-3 | Landfill Gas | 0.8 MW | Retired | December 2005 |
| E-4 | Landfill Gas | 0.8 MW | Retired | December 2005 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units E-1, E-2, E-3, E-4 scheduled to retire, 3.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| IL2 - W109 Under construction | Solar | 6.7 mi | 4.9 |
| EQUINIX LLC Built | Large load | 6.8 mi | |
| Romeoville 34 - SLCHI234 - BSCHI234 Under construction | Storage | 7.0 mi | 0.5 |
| Elwood 1-SLCHI901 Postponed | Solar | 7.5 mi | 1.3 |
| AC IL - Lockport West Under construction | Solar | 7.9 mi | 3.4 |
| AC IL - Lockport East Under construction | Solar | 8.5 mi | 3.1 |
| Dresden Island Hydroelectric Project Filed | Hydro | 9.7 mi | 10 |
| IL - Renewable Properties - Bobcat - Whi Under construction | Solar | 14.6 mi | 3 |
Sources EIA-860M · EPA ICIS-Air