Show on map
Kroger — Power plant · Gas, reciprocating engine · Onsite Partners Projectco, LLCCMH47 Land Development Bulkhead — Large load · OH · 2.4 km awayALTEC AC30-101B (Millersport data centre) — Large load · OH · 13.4 km awayUnion Ridge Solar — Solar · OH · 108 MW · 16.6 km awayUtica Aero Solar Max PV — Solar · OH · 12 MW · 19.0 km awayRipley Solar — Solar · OH · 100 MW · 19.3 km awayEastern Cottontail Solar — Solar · OH · 220 MW · 22.0 km awayCMH03 — Large load · OH · 22.5 km awaySouth Site Data Center Energy Center — Large load · OH · 23.0 km awayCyrusOne COL-1 — Large load · OH · 23.0 km awayBZI Crane (ECX CMH03) — Large load · OH · 23.4 km awayFlint — Storage · OH · 200 MW · 24.1 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Grid
0.5 kV to AEP Ohio Transmission Company, Inc. (PJM)
Location
Licking County, Ohio
Operated by
Onsite Partners Projectco, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
4 years since 2022
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
0.500
Transmission owner
AEP Ohio Transmission Company, Inc.
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CMH47 Land Development Bulkhead Filed Large load 2.4 km
ALTEC AC30-101B (Millersport data centre) Filed Large load 13.4 km
Union Ridge Solar Under construction Solar 16.6 km 108
Utica Aero Solar Max PV Postponed Solar 19.0 km 12
Ripley Solar Postponed Solar 19.3 km 100
Eastern Cottontail Solar Filed Solar 22.0 km 220
CMH03 Filed Large load 22.5 km
South Site Data Center Energy Center Filed Large load 23.0 km
CyrusOne COL-1 Filed Large load 23.0 km
BZI Crane (ECX CMH03) Filed Large load 23.4 km
Flint Under construction Storage 24.1 km 200