Ladysmith — Power plant · Gas, combustion turbine · Virginia Electric & Power CoAmazon Data Services Inc - IAD-457 — Large load · VA · 4.6 km awayIAD 458 Crane — Large load · VA · 4.8 km awayIAD 457 Mattameade — Large load · VA · 5.8 km awayClean Arc Data Centers - VA-1 Campus — Large load · VA · 6.2 km awayAMAZON DATA SERVICES INC. IAD450-456 COSNER TECH CAMPUS — Large load · VA · 15.1 km awayIAD-451 Crawler Crane — Large load · VA · 15.2 km awayCARMEL CHURCH DATA CENTER — Large load · VA · 16.8 km awayAmazon Data Services IAD-870 — Large load · VA · 16.9 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
992,525 MWh
Grid
230 kV to Virginia Electric & Power Co (PJM)
Location
Caroline County, Virginia

Output

Net generation MWh by year, 2003 to 2026
Fuel burned MMBtu by year, 2003 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
25 years since 2001
Unused energy
6,826 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,528 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110032891850
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001161
Fuel burned (MMBtu), 202510,449,093
Capacity factor, 20250.127
Heat rate (Btu/kWh), 202510,527.8
Net generation (MWh), 2025992,525
Balancing authority codePJM

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Virginia Electric & Power Co Operator EIA-860M
Dominion Energy Inc. Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Amazon Data Services Inc - IAD-457 Filed Large load 4.6 km
IAD 458 Crane Filed Large load 4.8 km
IAD 457 Mattameade Filed Large load 5.8 km
Clean Arc Data Centers - VA-1 Campus Filed Large load 6.2 km
AMAZON DATA SERVICES INC. IAD450-456 COSNER TECH CAMPUS Built Large load 15.1 km
IAD-451 Crawler Crane Filed Large load 15.2 km
CARMEL CHURCH DATA CENTER Under construction Large load 16.8 km
Amazon Data Services IAD-870 Filed Large load 16.9 km