Lafayette 2 - MLK Jr. Hospital (MLK)
Power plant · Solar
Key facts
Power plant · Solarran 14% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 2,091 MWh
- Grid
- 4 kV to Southern California Edison Co (CISO)
- Location
- Los Angeles County, California
- Operated by
- MN8 Energy LLC
Output
Details
Who’s behind it
Book a call
About these actionsWatch: follow it in your Deal room and on the map. Book a call: our team gets you what you need.
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 7,136 |
| Capacity factor, 2025 | 0.140 |
| Net generation (MWh), 2025 | 2,091 |
| Balancing authority code | CISO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 2.8
- AC capacity (MW)
- 1.7
- DC capacity (MW)
- 1.6
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2020
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Solar Star LA County I, LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
| MN8 Energy LLC | Operator | EIA-860M |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 5.3 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 5.3 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 5.4 mi | 1.2 |
| Dominguez - SLLAX512 Under construction | Solar | 5.5 mi | 1.3 |
| PRIME DATA CENTER VERNON Built | Large load | 5.6 mi | |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 6.8 mi | 1.4 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 7.1 mi | 94.2 |
| Bandini - SLLAX710 Under construction | Solar | 7.5 mi | 1.3 |
| LATTC South Campus Solar Postponed | Solar | 8.0 mi | 1.1 |
| Elevate Pier S Filed | Battery storage | 10.8 mi | 70 |
| Scattergood Postponed | Gas, combined cycle | 10.8 mi | 346 |
| San Pedro Public Market (SPPM) Under construction | Solar | 13.2 mi | 1.2 |
| CPA 3777 Workman Postponed | Solar | 13.4 mi | 1.9 |
Sources EIA-860M · EPA ICIS-NPDES · CAISO