Show on map
Torrance Dis Ctr 2 - SLLAX100Watson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 4.6 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 5.0 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 5.3 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 5.3 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 5.3 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 7.7 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 8.1 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 8.1 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 11.8 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 13.3 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 14.1 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Torrance Dis Ctr 2 - SLLAX100

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Los Angeles County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69891 generator LA100

Timeline

  • Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
  • Stated In-service date stated by EIA-860M.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Watson Cogeneration Withdrawn Gas, combined cycle 4.6 mi 94.2
Dominguez - SLLAX512 Under construction Solar 5.0 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 5.3 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 5.3 mi 1.3
Fordyce - SLLAX680 Under construction Solar 5.3 mi 1.3
Elevate Pier S Filed Storage 7.7 mi 70
Scattergood Postponed Gas, combined cycle 8.1 mi 346
San Pedro Public Market (SPPM) Under construction Solar 8.1 mi 1.2
PRIME DATA CENTER VERNON Built Large load 11.8 mi
LATTC South Campus Solar Postponed Solar 13.3 mi 1.1
Bandini - SLLAX710 Under construction Solar 14.1 mi 1.3

Sources CAISO · EIA-860M · EPA ICIS-NPDES

Sources

  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution