Torrance Dis Ctr 2 - SLLAX100
Solar
Key facts
Solar Under construction (source status: (TS) Construction complete, but not yet in commercial operation) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Los Angeles County, California
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 69891 generator LA100
Timeline
- Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
- Stated In-service date stated by EIA-860M.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Watson Cogeneration Withdrawn | Gas, combined cycle | 4.6 mi | 94.2 |
| Dominguez - SLLAX512 Under construction | Solar | 5.0 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 5.3 mi | 1.2 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 5.3 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 5.3 mi | 1.3 |
| Elevate Pier S Filed | Storage | 7.7 mi | 70 |
| Scattergood Postponed | Gas, combined cycle | 8.1 mi | 346 |
| San Pedro Public Market (SPPM) Under construction | Solar | 8.1 mi | 1.2 |
| PRIME DATA CENTER VERNON Built | Large load | 11.8 mi | |
| LATTC South Campus Solar Postponed | Solar | 13.3 mi | 1.1 |
| Bandini - SLLAX710 Under construction | Solar | 14.1 mi | 1.3 |
Sources CAISO · EIA-860M · EPA ICIS-NPDES