Show on map
Lake Creek 345 kV line — Transmission lineTradinghouse — Postponed · Gas, combustion turbine · TX · 471 MW · 0.1 mi awayLake Creek — Postponed · Coal · TX · 1,035.5 MW · 0.2 mi awayRoseland Solar Project, LLC — Under construction · Solar · TX · 500 MW · 7.6 mi awayPepper Solar Farm — Contracted · Solar · TX · 120.7 MW · 8.6 mi awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 10.8 mi awayGPI WACO Power — Under construction · Gas, combustion turbine · TX · 43.4 MW · 12.0 mi awayWaco Solar II — Announced · Solar · TX · 200 MW · 13.2 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lake Creek 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX
Owner (as stated)
Oncor Electric Delivery

Details

Who’s behind it

Owner
Oncor Electric Delivery

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
10
Substations at the ends (as the source names them)
Lake Creek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itoncor electric delivery
HIFLD line ID311222
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tradinghouse Postponed Gas, combustion turbine 0.1 mi 471
Lake Creek Postponed Coal 0.2 mi 1,035.5
Roseland Solar Project, LLC Under construction Solar 7.6 mi 500
Pepper Solar Farm Contracted Solar 8.6 mi 120.7
Findley PV and BESS Studied Solar + storage 10.8 mi 102.1
GPI WACO Power Under construction Gas, combustion turbine 12.0 mi 43.4
Waco Solar II Announced Solar 13.2 mi 200

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution