- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Lake Dorothy Hydroelectric Project: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Lake Dorothy Hydroelectric Project
Power plant · Hydro
Key facts
Power plant · Hydroran 65% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2009
- Net generation, 2025
- 81,670 MWh
- Grid
- 138 kV to Alaska Electric Light&Power Co
- Location
- Juneau County, Alaska
- Operated by
- Alaska Electric Light & Power Co.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 81,670
MWh - Fuel burned, 2025
- 278,658
MMBtu - Capacity factor, 2025
- 65.2
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 81,670 | 278,658 | 65.2% | — |
| 2024 | 83,625 | 285,328 | 66.6% | — |
| 2023 | 88,602 | 302,312 | 70.7% | — |
| 2022 | 84,043 | 286,755 | 67.1% | — |
| 2021 | 87,446 | 773,372 | 69.8% | — |
| 2020 | 72,444 | 635,116 | 57.7% | — |
| 2019 | 67,932 | 604,933 | 54.2% | — |
| 2018 | 81,558 | 742,505 | 65.1% | — |
| 2017 | 77,150 | 710,783 | 61.6% | — |
| 2016 | 87,454 | 807,374 | 69.6% | — |
| 2015 | 84,921 | 791,378 | 67.8% | — |
| 2014 | 83,600 | 795,035 | 66.7% | — |
| 2013 | 82,519 | 787,313 | 65.9% | — |
| 2012 | 84,467 | 803,787 | 67.2% | — |
| 2011 | 70,602 | 685,969 | 56.4% | — |
| 2010 | 58,741 | 573,078 | 46.9% | — |
| 2009 | 36,296 | 354,249 | 29.0% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.