Lake Gas Recovery — Power plant · Biomass · WM Illinois Renewable Energy LLCDes Plaines 11-SLCHI211 — Under construction · Solar · IL · 1.6 MW · 8.2 mi awayCloud HQ- ORD — Filed · Large load · IL · 8.6 mi awayTUR VENTURES LLC — Built · Large load · IL · 8.8 mi awayMelrose Park 2-SLCHI547 — Under construction · Solar · IL · 3 MW · 9.0 mi awayCLOUD HQ DATA CENTER — Built · Large load · IL · 9.5 mi awayPrime Data Center — Built · Large load · IL · 9.5 mi awaySTREAM DATA CENTERS ORDC CAMPUS — Built · Large load · IL · 9.7 mi awayCHI12 Data Center — Filed · Large load · IL · 9.8 mi awayAligned Data Centers ORD04 — Under construction · Large load · IL · 9.8 mi awayADP — Built · Large load · IL · 9.8 mi awayData Center 901 Busse Road Elk Grove — Filed · Large load · IL · 9.8 mi awayEDGECONNEX — Built · Large load · IL · 9.9 mi awayELK GROVE VILLAGE (CHI10-11-12) DATA CENTER — Large load · IL · 9.9 mi awayElk Grove 1-SLCHI701 — Under construction · Solar · IL · 1.7 MW · 9.9 mi awaySTREAM DATA CENTERS — Built · Large load · IL · 10.0 mi awayEDGECONNEX — Large load · IL · 10.1 mi awayT5@CHICAGO II LP — Built · Large load · IL · 10.1 mi awayEquinix CH5 Chiller — Built · Large load · IL · 10.1 mi awayEQUINIX CH-5 DATA CENTER — Built · Large load · IL · 10.2 mi awayElk Grove 51-SLCHI151 — Under construction · Solar · IL · 1.4 MW · 10.4 mi awayBensenville Ind Park 11 — Under construction · Solar · IL · 1.2 MW · 10.7 mi awayBensenville Ind Park 12-SLCHI412 — Postponed · Solar · IL · 1.1 MW · 10.7 mi awayBensenville Ind Park 10-SLCHI410 — Under construction · Solar · IL · 1.2 MW · 10.8 mi awayMobile Crane - Unit (Chicago data centre) — Filed · Large load · IL · 10.8 mi away2425 BUSSE ROAD LLC — Built · Large load · IL · 10.8 mi awayBensenville 13-SLCHI513 — Under construction · Solar · IL · 1.4 MW · 10.8 mi awayELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER — Built · Large load · IL · 10.8 mi awayBensenville Ind Park 6-SLCHI406 — Postponed · Solar · IL · 1.1 MW · 10.9 mi awayBensenville 14-SLCHI414 — Under construction · Solar · IL · 1.3 MW · 10.9 mi awayDIPPER VENTURES LLC CH3 DATA CENTER — Built · Large load · IL · 11.0 mi awayBensenville Ind Park 4-SLCHI424 — Under construction · Solar · IL · 1.7 MW · 11.0 mi awayBensenville Ind Park 2-SLCHI402 — Under construction · Solar · IL · 1.1 MW · 11.1 mi awayFranklin Park 2-SLCHI802 — Under construction · Solar · IL · 1.2 MW · 11.3 mi awayELK GROVE DATA CENTER LLC — Large load · IL · 11.3 mi awayCyrus One V3 Point 1 — Under construction · Large load · IL · 11.8 mi awayBensenville 2-SLCHI526 — Under construction · Solar · IL · 1.9 MW · 11.8 mi awayW Belmont Ave — Under construction · Solar · IL · 1.4 MW · 11.8 mi awayCHICAGO ENTERPRISE LLC — Built · Large load · IL · 11.8 mi awayDLR 9311 (Franklin Park data centre) — Filed · Large load · IL · 12.5 mi awayFRANKLIN PARK (CHI22) DATA CENTER — Built · Large load · IL · 12.5 mi awayCopenhagen Ct — Under construction · Solar · IL · 3.5 MW · 12.7 mi awayDIGITAL GRAND AVENUE 3 LLC — Built · Large load · IL · 12.8 mi awayNTT Data Centers — Built · Large load · IL · 12.9 mi awayT5 Data Center Northlake — Filed · Large load · IL · 13.0 mi awayT5@CHICAGO III LP — Built · Large load · IL · 13.0 mi awayNorthlake 5-SLCHI305 — Under construction · Solar · IL · 2.5 MW · 13.3 mi awayMICROSOFT CORP-CHICAGO DATA CENTER — Built · Large load · IL · 13.5 mi awayNorthlake 4-SLCHI304 — Under construction · Solar · IL · 1.4 MW · 13.7 mi awayNALCO WATER — Built · Large load · IL · 13.8 mi awayNorthlake 3-SLCHI303 — Under construction · Solar · IL · 1.6 MW · 13.9 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Lake Gas Recovery

Power plant · Biomass

Key facts

Power plant · Biomassran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2025
10,757 MWh
Grid
13 kV to Commonwealth Edison Co (PJM)
Location
Cook County, Illinois

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
33 years since 1993
Heat rate
23,025 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000790172
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003588
Fuel burned (MMBtu), 2025247,679
Capacity factor, 20250.205
Heat rate (Btu/kWh), 202523,024.9
Net generation (MWh), 202510,757
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3 MW
Generators retired
1
Capacity still in service
6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Landfill Gas3 MWRetiredOctober 2008

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV
Transmission or distribution system owner
Commonwealth Edison Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
WM Illinois Renewable Energy LLC Operator EIA-860M
WASTE MANAGEMENT INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit GEN1 scheduled to retire, 3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Des Plaines 11-SLCHI211 Under construction Solar 8.2 mi 1.6
Cloud HQ- ORD Filed Large load 8.6 mi
TUR VENTURES LLC Built Large load 8.8 mi
Melrose Park 2-SLCHI547 Under construction Solar 9.0 mi 3
CLOUD HQ DATA CENTER Built Large load 9.5 mi
Prime Data Center Built Large load 9.5 mi
STREAM DATA CENTERS ORDC CAMPUS Built Large load 9.7 mi
CHI12 Data Center Filed Large load 9.8 mi
Aligned Data Centers ORD04 Under construction Large load 9.8 mi
ADP Built Large load 9.8 mi
Data Center 901 Busse Road Elk Grove Filed Large load 9.8 mi
EDGECONNEX × 2 units Built Large load 9.9 mi
ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER Unknown Large load 9.9 mi
Elk Grove 1-SLCHI701 Under construction Solar 9.9 mi 1.7
STREAM DATA CENTERS Built Large load 10.0 mi
T5@CHICAGO II LP Built Large load 10.1 mi
Equinix CH5 Chiller Built Large load 10.1 mi
EQUINIX CH-5 DATA CENTER Built Large load 10.2 mi
Elk Grove 51-SLCHI151 Under construction Solar 10.4 mi 1.4
Bensenville Ind Park 11 Under construction Solar 10.7 mi 1.2
Bensenville Ind Park 12-SLCHI412 Postponed Solar 10.7 mi 1.1
Bensenville Ind Park 10-SLCHI410 Under construction Solar 10.8 mi 1.2
Mobile Crane - Unit (Chicago data centre) Filed Large load 10.8 mi
2425 BUSSE ROAD LLC Built Large load 10.8 mi
Bensenville 13-SLCHI513 Under construction Solar 10.8 mi 1.4
ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built Large load 10.8 mi
Bensenville Ind Park 6-SLCHI406 Postponed Solar 10.9 mi 1.1
Bensenville 14-SLCHI414 Under construction Solar 10.9 mi 1.3
DIPPER VENTURES LLC CH3 DATA CENTER Built Large load 11.0 mi
Bensenville Ind Park 4-SLCHI424 Under construction Solar 11.0 mi 1.7
Bensenville Ind Park 2-SLCHI402 Under construction Solar 11.1 mi 1.1
Franklin Park 2-SLCHI802 Under construction Solar 11.3 mi 1.2
ELK GROVE DATA CENTER LLC Unknown Large load 11.3 mi
Cyrus One V3 Point 1 Under construction Large load 11.8 mi
Bensenville 2-SLCHI526 Under construction Solar 11.8 mi 1.9
W Belmont Ave Under construction Solar 11.8 mi 1.4
CHICAGO ENTERPRISE LLC Built Large load 11.8 mi
DLR 9311 (Franklin Park data centre) Filed Large load 12.5 mi
FRANKLIN PARK (CHI22) DATA CENTER Built Large load 12.5 mi
Copenhagen Ct Under construction Solar 12.7 mi 3.5
DIGITAL GRAND AVENUE 3 LLC Built Large load 12.8 mi
NTT Data Centers Built Large load 12.9 mi
T5 Data Center Northlake Filed Large load 13.0 mi
T5@CHICAGO III LP Built Large load 13.0 mi
Northlake 5-SLCHI305 Under construction Solar 13.3 mi 2.5
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 13.5 mi
Northlake 4-SLCHI304 Under construction Solar 13.7 mi 1.4
NALCO WATER Built Large load 13.8 mi
Northlake 3-SLCHI303 Under construction Solar 13.9 mi 1.6

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution