Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
Lakehead: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Lakehead
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-IL, US-IN, US-MI, US-MN, US-ND, US-WI
- Operated by
- Enbridge IncSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 2,114
- Units
- 5
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 5 |
| Operator, as the source states it | ENBRIDGE |
| Mapped segments | 5 |
| Source release | 202001 |
| Pipeline name raw | Lakehead |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| AC IL - Lockport West Under construction | Solar | 0.1 km | 3.4 |
| Champion Solar I Postponed | Solar | 0.1 km | 51.9 |
| Superior Generation Energy Center Postponed | Gas, combustion turbine | 0.2 km | 170 |
| Gemstone Solar LLC Permitted | Solar | 0.3 km | 150 |
| KN216 Under construction | Solar | 0.3 km | 4.9 |
| Romeoville 34 - SLCHI234 - BSCHI234 Under construction | Storage | 0.6 km | 0.5 |
| Pivot Energy IL 55 LLC Under construction | Solar | 0.9 km | 3.1 |
| Pivot Energy IL 55b LLC Under construction | Solar | 1.0 km | 2.8 |
| AC IL - Lockport East Under construction | Solar | 1.0 km | 3.1 |
| Sunfish Solar 2 Under construction | Solar | 1.2 km | 360 |
| Spring Creek Agri-Energy Center Under construction | Solar | 1.4 km | 140 |
| Grand Basin Energy Storage Under construction | Storage | 2.8 km | 100 |
| Robbins Community Power LLC Postponed | Biomass | 3.1 km | 55 |
| St Joseph Energy Center Postponed | Gas, combined cycle | 3.2 km | 1,406 |
| MEC South Filed | Gas, combined cycle | 3.6 km | 500 |
| Osman Trust Under construction | Solar | 3.8 km | 4.5 |
| W 167th St Under construction | Solar | 3.8 km | 1.5 |
| MEC North Permitted | Gas, combined cycle | 3.8 km | 500 |
| AMAZON DATA SERVICES INCORPORATED Built | Large load | 4.1 km | |
| Ursa Solar, LLC Announced | Solar | 4.1 km | 200 |
| Stone Elephant Solar WI, LLC Filed | Solar | 5.7 km | 3 |
| DATA CENTER Built | Large load | 5.9 km | |
| SV CSG Sun Trust Solar Under construction | Solar | 6.0 km | 5 |
| Solway Solar Under construction | Solar | 6.6 km | 50 |
| Badger State Solar LLC Under construction | Solar | 7.0 km | 149 |
| HOBART DATA CENTER MASS GRADING - 1 Under construction | Large load | 7.1 km | |
| Hecate Energy Sunfish Solar LLC Filed | Solar | 7.4 km | 499 |
| 6097.00-IL CyrusOne - CHI 11A - Yorkville Filed | Large load | 7.4 km | |
| St. Clair Energy Centre 3 Announced | Gas, combustion turbine | 7.5 km | 245 |
| LPO DC CAMPUS Under construction | Large load | 7.7 km | |
| SV CSG Wilson School Solar Permitted | Solar | 7.9 km | 5 |
| Pivot Energy IL 52 Under construction | Solar | 8.3 km | 5 |
| IL - SMHEC - Moraine Valley Postponed | Solar | 8.8 km | 1.3 |
| OER IL - Groundhog Under construction | Solar | 9.3 km | 2 |
| Honey Creek Solar WI, LLC Filed | Solar | 9.6 km | 6 |
| Foundry Ridge Energy Center LLC Announced | Gas, combustion turbine | 9.7 km | 324 |
| Eastern Power Hydrogen Ready Power Plant Project 2 Under construction | Gas, combined cycle | 9.7 km | 300 |
| Eastern Power Hydrogen Ready Power Plant Project 1 Under construction | Gas, combined cycle | 9.7 km | 300 |
| Aurora 7-SLCHI307 Under construction | Solar | 10.0 km | 1.9 |
| Darien Solar Postponed | Storage | 10.2 km | 75 |
| Jackson County Solar, LLC Under construction | Solar | 10.2 km | 125 |
| Crawler Crane (Michigan City data centre) Filed | Large load | 10.3 km | |
| LAVENDER FIELDS HOLDINGS LLC Built | Large load | 10.3 km | |
| Karn Solar Energy Center Under construction | Solar | 10.7 km | 80 |
| Sinnissippi Solar Energy LLC Announced | Solar | 10.8 km | 100 |
| Internationale Ctr 11-SLCHI321 Under construction | Solar | 11.3 km | 1.8 |
| Clark Solar-Longwood Under construction | Solar | 11.4 km | 2.5 |
| Merrillville Solar Announced | Solar | 11.6 km | 100 |
| CYRUSONE LLC Unknown | Large load | 11.7 km | |
| 1454.07-IL 7 (Gevena data centre) Filed | Large load | 11.7 km |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · GEM
Sources
- EIA-860M
- EPA ICIS-Air
- EPA ICIS-NPDES
- FAA OE/AAA
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.