Show on map
Lakeville 230 kV line — Transmission lineAmerican Canyon RV Boat Storage — Under construction · Solar · CA · 1.9 MW · 2.0 mi awayValero Refinery Cogeneration Unit 2 — Postponed · Gas, other · CA · 51 MW · 3.1 mi awayDynamo Solar LLC — Contracted · Solar · CA · 24.5 MW · 4.8 mi awaySCWA R5 Pond Solar — Postponed · Solar · CA · 2 MW · 6.6 mi awayRichmond Cogen — Postponed · Gas, combined cycle · CA · 43 MW · 11.6 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lakeville 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
46
Substations at the ends (as the source names them)
Lakeville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID301497
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
American Canyon RV Boat Storage Under construction Solar 2.0 mi 1.9
Valero Refinery Cogeneration Unit 2 Postponed Gas, other 3.1 mi 51
Dynamo Solar LLC Contracted Solar 4.8 mi 24.5
SCWA R5 Pond Solar Postponed Solar 6.6 mi 2
Richmond Cogen Postponed Gas, combined cycle 11.6 mi 43

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution